Client
Spanish Ministry of Civil WorksDirección General de Carreteras
Engineer
José Antonio TorrojaMain Contractor
DRAGADOS OBRAS Y PROYECTOSSpecialised Subcontractor Launching works
CTT-Stronghold (VLS España)VSL Entity
VSL SpainVSL (Switzerland) Ltd.
Heavy Lifting Department
Date
2002Project Description
AN INNOVATIVE SOLUTION WITH VSL HEAVY LIFTING FOR SINGLE SPAN BRIDGESThe Spanish Ministry of Civil Works decided to improve the access road to the Alpujarras area and built the Lanjaron viaduct in the province of Granada. The depth of the valley to be spanned and the necessity to preserve the rests of a historical bridge built in the 11th century prevented the use of intermediate bearings and a launching solution was adopted.
The structure consisted of a bow string formed by two parallel trusses with a single span of 114m and a weight of 504t.
VLS Spain, supported by the Heavy Lifting expertise from VLS Switzerland, responsibles covered the launching works including the design, supply and installation of temporary structures.
The installation of the structure was followed by the launching operation consisting of two distinct phases. Covering the first 64m, the structure was loaded with a counter-weight and was moved with the help of two VSL SLU-70 units.Using this advanced position, the cables for the second phase were installed from the extremity of the bridge to the towers and concrete structures installed at the other side of the valley.
The principle of the movement during the second phase was like the effect of a fishing line that would take one extremity of the bridge from the opposite abutment and pulled it across the valley.